Culverts.
Project: Maltworks Development.
The Maltworks development required the re-positioning of an existing stormwater pipeline. This was a mixture of open waterway, boxed culverts and a Hynds culvert bridge. We constructed a reinforced concrete slab to house the culverts and then craned and secured the culverts into position. Wing walls and entry slabs were then constructed in-situ to complete the bridge.
To see more bridge and culvert images, please go to the Bridge Gallery
Please stop by again. Thank you for your interest!