CCC Banks Peninsula Bridges 2017-2018
Wainui Valley Road.
This bridge replacement presented numerous challenges, which required innovative thinking to overcome. As shown, the facing of the abutment was constructed under the existing bridge, before replacment.
Formfour received excellent environmental reports during the construction of this bridge.
Pigeon Bay
A diversion was created around this bridge construction in order to facilitate movement from the Pigeon Bay locals.. This enabled us to complete construction with minimal disruption to the community.
As usual, Formfour received an excellent environmental report.
Please stop by again. Thank you for your interest!